Laserfiche WebLink
4. Profile of Backfill Slope: The SB backfill slope and trench bottom shall be sounded at the <br /> beginning and end of each shift and converted to an as-built drawing. This drawing shall be <br /> reviewed daily as an indication of trench collapse, excessive settlement or sloughing. <br /> I. A qualified off-site laboratory shall be engaged by the Contractor to perform the permeability test called <br /> for in Table 1. <br /> J. Flexible wall permeability tests will be conducted on samples of the backfill to determine compliance <br /> with these specifications. Samples of the SB backfill will be obtained from the mixing area and will be <br /> sent to the off-site laboratory for testing. The test parameters will be as follows: <br /> 1. Average Effective Confining Stress=5 psi. <br /> 2. Hydraulic Gradient= 10 <br /> K. Documentation <br /> 1. Results of all tests performed will be recorded on forms acceptable to the Engineer. These forms <br /> will be available to the Engineer at all times for his/her inspection. Copies of all Contractor- <br /> required quality control documents will be submitted daily to the Engineer for his verification. <br /> 2. Results of all Construction activities shall be recorded daily on a form acceptable to the Engineer. <br /> At a minimum, these forms are to include: <br /> a. The project station both at the starting and ending location for each day for the following: <br /> i. Top of backfill <br /> ii. Toe of backfill <br /> iii. Last completed set <br /> b. Verified area of excavated material <br /> c. Contractor's start and stop work times <br /> d. Contractor's activities <br /> e. Set summaries that include: <br /> i. Start and stop time for excavation of the set <br /> ii. Depth to bedrock <br /> iii. Depth to bottom of key <br /> iv. Description of bedrock <br /> 3. An as-built profile drawing of the trench bottom and backfill slope shall be continuously maintained <br /> by the Contractor. The profile shall indicate the extent of excavation and backfill at the end of each <br /> working day. The daily profile shall be drawn in an electronic format or by hand. <br /> L. Performance testing of the completed slurry wall will be completed by the Owner's Representative in <br /> accordance with the"State Engineer Guidelines for Lining Criteria for Gravel Pits,"August 1999, <br /> Section 3.1. These guidelines stipulated a 90-day liner test to determine if the slurry wall keyed into the <br /> bedrock will meet the performance standards defined by the State Engineer,thereby releasing the <br /> Owner from augmentation responsibilities for the gravel pit. The testing consists of performing a 90-day <br /> liner test, used to determine the water balance to demonstrate the inflows(precipitation, groundwater) <br /> and outflows(evaporation). <br /> 31 66 17-11 <br /> Prowers Aggregate Operators, LLC <br /> West Farm Pit Phase 2 Slurry Wall Soil-Bentonite Slurry Walls <br />