Laserfiche WebLink
RPM,Inc. <br /> December 18, 2018 <br /> Colorado Division of Reclamation, Mining and Safety <br /> Attn: Mr. Patrick Lennberg <br /> 1313 Sherman St., Rm 215 <br /> Denver, CO 80203 <br /> RE: Request to extend the submittal date for Pueblo West Pit, File No. M-1977-573 TR <br /> Corrective Action Date from January 10, 2019 to February 10, 2019 <br /> Dear Mr. Lennberg, <br /> Transit Mix Concrete Co. of Pueblo/Continental Materials Corp. (TMCCOP/CMC) requests the <br /> Corrective Action due date for submittal of the Technical Revision (TR) for the Pueblo West Pit, <br /> File No. M-1977-573, be extended from January 10, 2019 to February 10, 2019. <br /> We would like to include the Finger Lake area into the requested TR if the Colorado Division of <br /> Parks and Wildlife (CDPW) determine it requires additional reclamation measures. Therefore, <br /> we will need time for meeting(s) with the CDPW. In addition, the CDPW may require a site <br /> visit. A site visit would likely include the presence of the Division of Reclamation, Mining and <br /> Safety (CDRMS). <br /> Given the Finger Lake area is stable and vegetated; an extension should not result in any <br /> environmental harm or off-site damage. We therefore request the TR submittal date extension. <br /> Respectfully, <br /> H. Bruce Humphries <br /> Regulatory Permits Management,Inc. <br /> Consultant for Transit Mix Concrete Co <br /> Cc: Brandon Heser- Transit Mix Concrete Co. <br /> Andre Laroche - Transit Mix Concrete Co <br /> RP'N.Inc.,25049 E.Alder Dr.,Aurora,CO 80016 Phone:(303)854-7499 Email:hlhumphries2,p)comcast.net <br />