My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-17_GENERAL DOCUMENTS - C2010089
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010089
>
2018-12-17_GENERAL DOCUMENTS - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2018 7:45:35 AM
Creation date
12/19/2018 7:43:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
General Documents
Doc Date
12/17/2018
Doc Name Note
For SL1
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Permit Index Doc Type
Findings
Email Name
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Number C-2010-089 Page 4 of 6 <br />PHASE II <br /> <br />Rule 3.03.1(2)(b) states, "Up to eighty-five percent of the applicable bond amount shall be released upon <br />the establishment of vegetation which supports the approved postmining land use and which meets the <br />approved success standard for cover... based on statistically valid data collected during a single year of the <br />liability period". In regard to Phase II bond release, Rule 3.03.2(3)(b) also states, " No more than sixty <br />(60) percent of the bond shall be released so long as the lands to which the release would be applicable are <br />contributing suspended solids to streamflow or runoff outside the permit area in excess of premining levels <br />as determined by baseline data or in excess of levels determined on adjacent nonmined areas". <br /> <br />Topsoil was not removed for the installation or reclamation of the three wells. During the bond release <br />inspection, it was noted that there was some surface disturbance and some damage to the vegetation caused <br />by the vehicles of the well reclamation team. The damaged area is approximately 500 square feet in size. <br />Soil erosion and contributing suspended solids to streamflow or runoff outside the permit area is not a <br />concern due to the small size, to topography being almost completely flat and to the area being surrounded <br />by dense established grasses and shrubs; therefore, the requirement for cover data was waived. <br /> <br /> <br />PHASE III <br /> <br />Rule 3.03.1(2)(c) states that the final portion of performance bond, "shall be released when the permittee <br />has successfully completed all surface coal mining reclamation operations in accordance with this <br />approved reclamation plan, and the final inspection procedures of 3.03.2 have been satisfied. This shall <br />not be before the expiration of the period specified for revegetation responsibility in 3.02.3." Rule <br />3.03.1(4) states, " No bond shall be fully released until all reclamation requirements of these Rules and the <br />Act are fully met...". The same rule goes on to state, " No acreage shall be released from the permit area <br />until all surface coal mining and reclamation operations on that acreage have been completed in <br />accordance with the approved reclamation plan." <br /> <br />The damaged area is approximately 500 square feet in size and is completely surrounded by established, <br />undisturbed clusters of grasses and shrubs. The temporary seed mix #3 was spread over the area to <br />supplement the existing vegetation. The existing vegetation should recover quickly because the soil <br />seedbank and rootstock were not disturbed and because of the close proximity of the disturbance to <br />established undisturbed vegetation. <br /> <br /> <br /> <br />III. OBSERVATIONS AND FINDINGS <br /> <br />PHASE I <br /> <br />The 3 monitoring wells (GW-47, GW-48 and GW-49) were backfilled and sealed in compliance with the <br />permit. Well abandonment reports have been submitted to DRMS and the Office of the State Engineer. <br /> <br />Summary and Conclusions <br />
The URL can be used to link to this page
Your browser does not support the video tag.