My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-17_GENERAL DOCUMENTS - C2010089
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010089
>
2018-12-17_GENERAL DOCUMENTS - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2018 7:45:35 AM
Creation date
12/19/2018 7:43:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
General Documents
Doc Date
12/17/2018
Doc Name Note
For SL1
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Permit Index Doc Type
Findings
Email Name
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Number C-2010-089 Page 3 of 6 <br />I. PROCEDURES AND SUMMARY OF THE REVIEW PROCESS <br /> <br /> Elk Ridge Mining and Reclamation, LLC (ERMR) applied for a partial bond release under the <br />Colorado Surface Coal Mining and Reclamation Act following reclamation at the New Horizon <br />North Mine. The mine is located in Montrose County, in portions of Sections 25 and 36, T 47 N, <br />R 16 W, N.M.P.M.. The mine area is located in: <br /> <br />Township 47 North, Range 16 West, New Mexico Principal Meridian <br /> Section 25: W 1/2 <br /> Section 36: Portions of the NW 1/4 and the NW 1/4 NW 1/4 SW 1/4 <br /> <br /> An application for partial Phase I, II and III bond release (SL-1) was received by the Division on <br />September 24, 2018. The application was deemed complete on October 19, 2018, after the <br />Division received proof of publication of the applicant's public notice. ERMR published notice of <br />the bond release application in San Miguel Basin Forum once weekly for four consecutive weeks, <br />beginning September 13, 2018. ERMR also notified land owners within and adjacent to the mine <br />permit area, and other interested parties of the application for bond release, as required by Rule <br />3.03.2(1). <br /> <br /> No comments, written objections, or requests for an informal conference regarding the bond <br />release application were received by the Division. <br /> <br /> The Division scheduled and conducted a bond release inspection on November 6, 2018. The site <br />inspection was conducted in accordance with Rule 3.03.2(2). In attendance for the inspection were <br />George Glasier (landowner), Frank Ferris (ERMR) and Christine Belka (OSMRE). <br /> <br />No questions, comments or request for an informal conference were received by the Division <br />within 30 days following the inspection (Rule 3.03.2(3)). <br /> <br /> <br />II. CRITERIA AND SCHEDULE FOR BOND RELEASE <br /> <br /> <br />PHASE I <br /> <br />Rule 3.03.1(2)(a) states, "Up to sixty percent of the applicable bond amount shall be released when the <br />permittee successfully completes backfilling, regrading, and drainage control in accordance with the <br />approved reclamation plan." With regard to Phase I bond release, the approved reclamation plan for the <br />New Horizon North Mine calls for permanent sealing of 3 water monitoring wells. <br /> <br />The well sealing procedures are outlined in Section 2.05.6(3)(b)(v) of the permit. The bottoms of the wells <br />were backfilled with pea gravel, then bentonite and finally concrete to within 6 inches of the surface. The <br />exact quantities for each material used in each well are documented in the well abandonment reports <br />submitted by ERMR to DRMS and the State Engineer. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.