Laserfiche WebLink
J&J Collecting project#1 <br /> Hard rock/metal mining <br /> Limited impact operation (110(1) <br /> Reclamation permit application <br /> 6.3.5 (3) EXHIBIT E -RECLAMATION PLAN MAP <br /> - Claim line" <br /> OLOL) <br /> 3 ' <br /> X <br /> :boundary <br /> Permit ° <br /> boundary <br /> �.e rm rt <br /> oundary <br /> er, • t• I <br /> MY'S <br /> ` rv� • �.� l � f`•XW�,Y°. AwrMXXiMry rvXrv+a4wrwro.i il. <br /> - rvnrvr, <br /> �,4T '� «'��'�^,.�„;'. �.il►I... ,"jy`f�• �MWIXiM.q..��� <br /> '�+M4 w '� Ipyl �J .�wM ' ;.na..•.,�a�ry wuupr�., .,,. <br /> v„4 ` <br /> IIIiYpWs <br /> LM n10 tme Su,x bo kd�ry <br /> c ner Se on <br /> 1 T 1 ,S, R 7t W 1 <br /> N <br /> Prepared by: <br /> — "o, —Jeff Schimell <br /> �h�,�`� 1 inch = 400 feet <br /> NAD 27 <br /> E� Wcv\rr�, ia� ���.1f Prepared July 30111, 2018 <br /> Applicants: Jeff Schimel anc <br /> Jim Reed <br /> Notes: (1) Vegetation will not be established on undisturbed lands. 1. CMC No. 288179 New Hawk <br /> (2) The average thickness of replaced overburden will be six (6) feet. <br /> (3) The average thickness of replaced topsoil will be 4-8 inches. (4) 2. CMC No. 288118 Dragon <br /> Phe average thickness of replaced growth medium will be 4-8 inches. 3. CMC No. 288116 Wildcat <br /> 1 All exhibit maps were prepared by Jeff Schimel and based on USGS engineered topographical maps (as revised by the U.S. Forest Service), <br /> according to the North American Datum of 1927(NAD 27),and thus complies with national map accuracy standards. <br />