Laserfiche WebLink
J&j collecting project#1 <br /> Hard rock/metal mining <br /> Limited impact operation (110(1) <br /> Reclamation permit application <br /> 6.3.5 (2) EXHIBIT E-MINING PLAN MAP -DETAIL 1 <br /> Aoft <br /> ui <br /> w <br /> .� <br /> /L <br /> - <br /> r <br /> Yw AF <br /> F 1. <br /> *._• iY�" y WN � ,+.WMYw"" ;'ems" <br /> Vie <br /> � <br /> s YXMNM <br /> y l +� <br /> '.. <br /> /O\N\ %t i _1 <br /> Legend N <br /> . Prepared by: <br /> TOPSOIL ��— <br /> +':� <br /> OVERBURDEN Jeff Schimell <br /> 1 inch = 400 feet <br /> . _ . PROPOSED DIG <br /> I NAD 27 <br /> wQ p Prepared July 30111, 2018 <br /> PERMIT BOUNDARY � �e.�.�r��,fi-ta� 1 .irtcr <br /> Applicants: Jeff Schimel and Jim Reed <br /> FOREST SERVICE ROAD TOTAL PERMIT AFFECTED AREA 1.39 ACRES <br /> PLANNED DISTURBANCE: <br /> --- CLAIM BOUNDARY SITE 1: .32 ACRE <br /> SITE 2 &3: .60 ACRE <br /> PERMIT AREA (WALK-IN) ROAD SITE 4: .197 ACRE <br /> PERMIT AREA WALK-IN ROADS: .266 ACRE <br /> TOTES: (1) Growth medium to be salvaged 4 inches min to 8 inches max. (2)The number of dig sites will not exceed 2 at a time. (3)The <br /> epth of excavations will not exceed 20 feet. (4) The locations shown of proposed digs,topsoil,overburden,and growth medium stockpiles <br /> re approximate.Their specific sizes and locations will depend on the mineral lode direction of trend and depth.These stockpiles total <br /> olume will not exceed the total volume of cubic yards shown on Exhibit D, 6.3.4(2). (5) Not more than.60 acres will be disturbed at any <br /> ne time. 1 All exhibit maps were prepared by Jeff Schimel and based on USGS engineered topographical maps(as revised by the U.S. Forest <br /> arviral nrrnrrlina to tha Kinrth Amoriran r)atiim of 1Q)7 miAn )71 and thiic rmmnliac With natinnal man arrnrnry ctnnrlarrk <br />