Laserfiche WebLink
Page 55 of 60 <br /> <br />CIRCES Cost Estimating Software <br /> - Transformer 1 EA NON-PCB Transformer <br />Removal <br />1.00 EA $2,082.20 $2,082.20 <br />18" Culvert Removal 266 LF Pipe, corrugated metal <br />(CMP) - 18 in. <br />diameter pipe <br />266.00 LF $3.78 $1,005.75 <br />24" Culvert Removal 1,110 LF Pipe, corrugated metal <br />(CMP) - 24 in. <br />diameter pipe <br />1,110.00 LF $4.88 $5,415.69 <br />36" Culvert Removal 82 LF Pipe, corrugated metal <br />(CMP) - 36 in. <br />diameter pipe <br />82.00 LF $7.53 $617.62 <br />96" Culvert Over <br />Loading Conveyor <br />70 LF Pipe, reinforced <br />concrete (RCP) - 96 in. <br />diameter pipe <br />70.00 LF $78.39 $5,487.51 <br />Remove Bridge Over <br />Reed Wash <br />150'x25' Bridge Demolition - <br />Concrete <br />3,750.00 SF $17.15 $64,312.50 <br />Clean-Up Material <br />Storage Area <br />Assume 25 CY Loading and 2 mile <br />haul, no salvage - <br />Machine loading <br />25.00 CY $17.20 $430.00 <br />Remove Silt Fence <br />around Loadout <br />Assume 2,400 <br />LF <br />Dump fees - Rubbish <br />only <br />150.00 CY $9.45 $1,417.50 <br /> <br />Job Hours: 400.00 <br />Subtotal <br />(unadjusted): $308,984.47 <br />Total Cost <br />(adjusted for <br />location): $282,102.82 <br />