Laserfiche WebLink
Page 54 of 60 <br /> <br />CIRCES Cost Estimating Software <br /> - Footing 2'x3'x80 LF Demo. and on-site <br />disposal in excavated <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />80.00 LF $10.75 $860.00 <br /> - Railroad Track 11,900 LF` Railroad track - Ties <br />and track <br />11,900.00 LF $9.19 $109,361.00 <br /> - Ballast 2644 CY Railroad track - Ballast 2,644.00 CY $4.67 $12,347.48 <br />Stacker Conveyor 180 LF OBSOLETE-Conveyor, <br />elevated, including <br />supports - 5 ft. W x 6 <br />ft. H housing <br />180.00 LF $44.51 $8,011.62 <br />Radial Stacker <br />Conveyor <br />160 LF OBSOLETE-Conveyor, <br />elevated, including <br />supports - 5 ft. W x 6 <br />ft. H housing <br />160.00 LF $44.51 $7,121.44 <br />Loading Conveyor 570 LF OBSOLETE-Conveyor, <br />elevated, including <br />supports - 8 ft. W x 10 <br />ft. H housing <br />570.00 LF $53.42 $30,449.40 <br />Reclaim Tunnel 12'x330'x12" <br />(4) <br />Demo. and on-site <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />15,840.00 SF $1.81 $28,670.40 <br /> - Escape Tube 42" x 90 LF Pipe, corrugated metal <br />(CMP) - 48 in. <br />diameter pipe <br />90.00 LF $10.75 $967.86 <br />Coal Sampling <br />Building <br />8'x20'x8' Bldg. (SN) demo./on- <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />1,280.00 CF $0.20 $252.16 <br /> - Floor 8'x20'x6" Demo. and on-site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />160.00 SF $0.85 $136.48 <br />Shop/Office Trailer 8'x40'x8' Bldg. (SN) demo./on- <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />2,560.00 CF $0.20 $504.32 <br />MCC Building 8'x20'x8' Bldg. (SN) demo./on- <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />2,560.00 CF $0.20 $504.32 <br /> - Floor 8'x20'x12" Demo. and on-site <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />160.00 SF $1.71 $272.96 <br /> - Footing 2'x3'x56 LF Demo. and on-site <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. 200 <br />ft. push <br />56.00 LF $10.26 $574.56 <br />6,000 Gallon Fuel <br />Tank <br />6,000 Gallons Comprehensive storage <br />tank removal, non- <br />leaking - 6,000 to <br />8,000 gal. tank <br />1.00 EA $5,286.80 $5,286.80 <br />Power Lines 1,000 LF Powerline or utility line <br />- Structural Steel Box <br />Type Frame Structure <br />Dismantle and Dispose <br />3.25 EA $1,701.00 $5,528.25