My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-11_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2018-12-11_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 2:54:06 PM
Creation date
12/11/2018 2:42:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
12/11/2018
Doc Name
Incompleteness Letter
From
DRMS
To
GCC Energy, LLC
Type & Sequence
TR27
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />5. Cross sections of the proposed changes to the coal mine waste bank were not included in the TR- <br />27 submittal and are required according to Rule 2.05.3(8)(a)(i)(B). Please submit cross section of <br />the proposed waste bank. <br /> <br />6. Stoner Engineering & Surveying on behalf of GCC conducted an engineering report (the Report) <br />for the King Coal Waste Bank Expansion (the Expansion). However, there is no indication that the <br />provided engineering report was certified by or under the supervision of a qualified registered <br />professional engineer as required by Rule 2.05.3(8)(a)(ii)(A). Please submit an engineer certified <br />version of this report. <br /> <br />7. As stated in the Report, material properties of the waste material associated with the Expansion <br />were evaluated by Trautner Geotech LLC and are included as part of the submittal as Appendix <br />10(4A). Appendix 10(4A) was not provided with the application. Additionally, the Report states a <br />stability analysis was performed, however no analysis was provided for the Division’s review. The <br />stability analysis should provide the results associated with the waste bank that meet the <br />requirements of Rule 4.10 as well as provide the parameters used in the analysis. Please submit this <br />missing data. <br /> <br />8. As per Rule 2.10.3(2), maps included in the permit application shall be prepared by or under the <br />direction of, and certified by, a qualified registered professional engineer or geologist. The maps <br />provided in TR-27 were not certified by a qualified registered professional engineer. Please <br />resubmit the maps with an certified engineer stamp. <br /> <br />9. A discussion about the reclamation plan for the waste pile was not included in the TR-27 <br />application as required by Rule 2.05.4. Topics that need to be addressed include (but are not limited <br />to): topsoil storage and redistribution and waste pile cover material. Also, a letter from the <br />landowner authorizing the changes proposed in TR-27 is required by Rule 2.05.5(1)(b). <br /> <br />In accordance with Rule 2.07.3(1), you have the opportunity to amend, review, or otherwise make <br />your application complete. <br /> <br />If you have any questions, please contact me. <br /> <br />Sincerely, <br /> <br /> <br /> <br />Brock F. Bowles <br />Environmental Protection Specialist <br />Brock.bowles@state.co.us <br /> <br /> <br /> <br />C-TR-01
The URL can be used to link to this page
Your browser does not support the video tag.