Laserfiche WebLink
rati topsoil Placement <br />,ASOIL PLACEMENT SCRAPERS <br />"M A92-3 <br />Type <br />Title <br />Distance <br />Grade <br />Roll <br />Max <br />Curve <br />Final <br />Load <br />feet <br />% <br />Ron. % <br />mph <br />Angle <br />nth <br />% of Full <br />Queue at Loader <br />yE <br />Spot Time at loader <br />Auto <br />Loading <br />Auto <br />Haul Segment <br />165.0 <br />-6.6 <br />4.0 <br />Max <br />0.0 <br />Max <br />Full <br />` <br />Haul Segment <br />55.0 <br />D_0 <br />3.5 <br />Max <br />0.0 <br />Max <br />Full <br />"A <br />Haul Segment <br />130.0 <br />2.8 <br />3.5 <br />Max <br />0.0 <br />Max <br />Full <br />Spot Time at Dump <br />Auto <br />Wft <br />Dumping <br />Auto <br />Orlis <br />' <br />Haul Segment (rev.) <br />130.0 <br />2.8 <br />3.5 <br />Max <br />0.0 <br />Max <br />Empty <br />b <br />Haul Segment (rev.) <br />55.0 <br />0.0 <br />3.5 <br />Max <br />0.0 <br />Max <br />Empty <br />8 <br />Haul Segment (rev.) <br />165.0 <br />6.6 <br />4.0 <br />Max <br />0.0 <br />Max <br />Empty <br />Prepared by:.Tkn Cummins <br />Prepared for. PR7_ Worst Case Bond Calculations <br />falpac <br />.Trapper Mining Inc. <br />5 -Apr -201312:02 PM Page 1 <br />