TOPSOIL� PLACEMENT -SCRAPERS <br />Haulage System: Scrapers Worst Case 2413 <br />Material: [PRJj Torlsoi/ <br />Haul Cycle: [PRJj A92.3 <br />PRJj 5 day Week - 8 Ho. <br />Availability <br />00 <br />_ , _ <br />Bucket Fill Factor <br />85.00 <br />Average Bucket Load Volume <br />0.80 <br />Average Payload <br />cu -yards <br />bcy <br />27.14 <br />Orating Hours per Year <br />OpHr/Year <br />18.85 <br />Average Operating Shifts per Year <br />shifts/Year <br />11099.00 <br />Average Bucket Cycle Time <br />min157.00 <br />Loaded Transport Tim® <br />min <br />1.70 <br />Unloaded Transport Time <br />0.38 <br />Total Loading unit Cycle Time <br />min <br />0.39 <br />Transport Distance (One Way) <br />min <br />feet <br />0.97 <br />Production per Operating Hour <br />bcy <br />350.00 <br />Production Per Loader Operating Shift <br />239.61 <br />Production er Year <br />bcy <br />bry <br />1,677 <br />263 337 <br />Production per Year <br />bcy/Year <br />263,337 <br />Discounted Capital Cost <br />$/, <br />Discounted Operating Cost <br />$/bcy <br />0.00 <br />Discounted Average Cost <br />�'b�y <br />0.00 <br />Excavation Target <br />Time to move Excavation Target <br />0.00 <br />7,632.00 <br />Loader Hrs to move Target <br />Das <br />y <br />Op. Hours. <br />10.59 <br />Total Truck Hm to move Target get <br />Op. Hours. <br />32 <br />Total cost to move Target <br />$ <br />32 <br />0 <br />r.IM <br />Op. I'M factored by avaiiamity <br />Shifts fecta9d by availability <br />Max. Prod. bMW on 100% "1. <br />Loading Methodology <br />Single Sided <br />Full Truck <br />Average for 150 Shifts <br />Productivity estimates allow for Insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br />This simulation is based on data provided by the equipment manufacturer. <br />Equipment data should be checked to ensure it is valid for this site. <br />Talpac <br />r'repared by: Tim Cummins <br />Prropared f Dr: •PR7 Worst Case Bond Calculations •Trapper Mining Inc. <br />5 -Apr -201312:04 PM Page 1 <br />