My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-30_PERMIT FILE - C1981010A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2018-11-30_PERMIT FILE - C1981010A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 8:03:12 AM
Creation date
12/11/2018 11:36:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
11/30/2018
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Appendix A Reclamation Cost Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper <br />vs Truck erode of Kjedip Plea <br />SCRAPER VS TRUCK FtEGRADE OF K.GDIP PITS <br />Haulage System: Scraper Topsoil KLM 2014WCS <br />Haul Cycle: [pRJ] O1_p1 <br />Availability <br />Bucket Fill Factor <br />% <br />85.00 <br />Average Bucket Load Volume0.85 <br />Average Payload <br />CU -yards <br />bcy <br />27.05 <br />Operating Hours per Year <br />OpHr/Year <br />22.54 <br />Average Operating Shifts per Year <br />shifts/Year <br />2,653.00 <br />Average Bucket Cycle Time <br />379.00 <br />1-40ded Transport Time <br />min <br />min <br />1.80 <br />Unloaded Transport Time <br />2.18 <br />Total Loading unit Cycle Time <br />min <br />1 73 <br />Transport Distance (One Way) <br />min <br />feet <br />3.73 <br />Pmduc"an Per Operating Hour <br />1.990.00 <br />Prvducdon I& Loader Operating Shift <br />bey <br />173.74 <br />Production ow Year <br />bcy <br />hev <br />1,210 <br />400.932 <br />Production per Year <br />bcy/Year <br />460,932 <br />Discounted Capital Cost <br />$rycy <br />DlsCounted Operating Cost <br />$/bcy <br />0.00 <br />Discounted Average Cost <br />$/bey <br />0.00 <br />Exavation Target <br />Time to move Excavation Target <br />bcy <br />0.00 <br />101,948.00 <br />Loader Hrs to move Target <br />Days <br />O Hours. <br />p <br />80.79 <br />Total Truck Hrs to move T <br />Target <br />O <br />Op. Hours. <br />587 <br />Total cost to move Target <br />$ <br />587 <br />0 <br />Op. hrs factored by availability <br />Shifts factored by "lability <br />Max prod. based on 100% avail. <br />Loading Methodology <br />Single Sided <br />Full Bucket <br />Average for 15o Shifts <br />Productivity estimates allow for Insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br />Equipment data should be checked to ensure it is valid for this site. <br />Talpac <br />PrOPWW by:.Tim Cummins •Trapper Mining Inc. <br />7 -May -201312:19 PM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.