Laserfiche WebLink
Responses to Second Adequacy Review Letter dated 12 October 2018, <br /> 110(2) Hard Rock Limited Impact Mine Reclamation Permit Application, <br /> M-2018-036 Ten Percenter Claim <br /> Comments from the Second Adequacy Review Letter dated 12 October 2018 are included <br /> below in italic typeface. Our responses are in regular typeface. <br /> GENERAL APPLICATION PROCEDURES: <br /> 1. As required by Rule 1.6.2, please submit proof of publication in a newspaper of general <br /> circulation in the locality of the proposed mining operation. <br /> Done and proof sent to DRMS with transmittal letter dated 12 October 2018. <br /> 2. As required by Rule 1.6.2, please submit proof of the notice to all owners of record of <br /> surface and mineral rights of the affected land and the owners of record of all land surface <br /> within 200 feet of the boundary of the affected land. Proof of notice may be return receipts of a <br /> Certified Mailing or by proof of personal service. <br /> Done and proof sent to DRMS with transmittal letter dated 12 October 2018. <br /> 3. To date, the Division has received comments from the Division of Water Resources and <br /> History Colorado regarding the application. The letters are attached for your review. Please <br /> acknowledge and address any comments noted in the letters and make changes to the <br /> application as necessary. <br /> Receipt is hereby acknowledged and all comments have been reviewed. No changes to the <br /> application are required to comply with the comments received. Copies of the comments are <br /> additionally attached for filing. <br /> 6.2 GENERAL REQUIREMENTS OF EXHIBITS: <br /> 4. The maps submitted with the application do not meet the minimum requirements of <br /> Rule 6.2.1(2). The following three items identify the missing information: <br /> a. All of the maps submitted are not signed or dated. In accordance with Rules <br /> 6.2.1(2)(b)and 6.2.1(2)(e), please update these maps to include the signature of the <br /> registered land surveyor, professional engineer, other qualified person who prepared the <br /> maps and give the date prepared. <br />