Laserfiche WebLink
Photo 6. Widening of gully with undercutting of fence and dangling T -posts of the fence. <br />Another fact should be reported. The gullies on Chen's Hill, on the West Pit, and on the East Pit are <br />eroding and deepening more rapidly at the bottom ends of the gullies than at the top, thereby <br />increasing the gradients. This will increase the flow rates in these gullies which will increase the erosion <br />in the future. <br />The locations of the detail surveys of the gullies are shown on the Map 1 in red, and the midpoint <br />locations of the individual significant gullies are shown in blue. <br />