Laserfiche WebLink
Table No.3 Applegate <br /> Bucklen Equipment Company,Inc. rrx <br /> Bucklen Pit(M-1982-131) Group, inc. <br /> Lagging Distance(X)= 1,390 feet RECEiVEC <br /> Aquifer Transmissivity(T)= 120,000 gallons per day per foot <br /> Specific Yield= 0.2 <br /> Aquifer Width(W)= 10,650 SEP 0 5 2018 <br /> Date Revised 8/31/2018 WAXER RESOURCIi <br /> Lagged Depletions AG Job#. 08-127 STATE ENGINEER <br /> From Mining COLO <br /> Evaporation Operation Total Lagged <br /> WY 2019 CU CU CU Depletions <br /> Lac-ft] (ac-ftJ lac-ft] (ac-ft] <br /> Month (A) (B) (C) (0) <br /> November 131 0 05 1.36 2.69 <br /> December 0 00 0 04 0.04 1.80 <br /> January 0 00 0 07 0.07 1.23 <br /> February 138 0 04 1.41 1.34 <br /> March 180 02 2.04 1,93 <br /> April 2.92 0 26 3.18 2.43 <br /> May 3.85 0 28 4.13 3.19 <br /> June 5 43 0 24 5.67 3.97 <br /> July 5.97 0 26 6.23 4.84 <br /> August 5.51 0 29 5.80 5.03 <br /> September 3.89 0.23 4.12 4.43 <br /> October 2.54 0.24 2.78 3.73 <br /> Total 34.60 2.24 36.84 36.61 <br /> Notes: <br /> (A)Evaporation CU from Table 1 <br /> (B)Operation CU from Table 2 <br /> (C)Total CU=(A)+(B) <br /> (0)Lagged depletions from total CU. Accounts for evaporation and operational uses from prior SWSPs <br /> N:\08127 Bucklen Pit Augmentation\Disciplines(Technical)\Water Rights\SWSP\WY 2019\Bucklen Pit 2019.xlsx <br />