Laserfiche WebLink
Table No. 2 Applegate <br /> Bucklen Equipment Company, Inc. r, <br /> Bucklen Pit(M-1982-131) Group, Inc. <br /> Operational Consumptive Use(aka Operation CU) Date Revised: 8/31/2018 <br /> From Mining AG Job#: 08-127 <br /> Month Percent of Monthly Water Retained Water Used Operation <br /> Annual Production in Product for Dust Control CU <br /> Production [tons] [ac-ft] [ac-ft] [ac-ft] <br /> (A) (B) (C) (0) (E) <br /> November 7% 3,500 0.05 0.00 0.05 <br /> December 6% 3,000 0.04 0.00 0.04 <br /> January 9% 4,500 0.07 0.00 0.07 <br /> February 5% 2,500 0.04 0.00 0.04 <br /> March 6% 3,000 0.04 0.19 0.23 <br /> April 10% 5,000 0.07 0.18 0.26 <br /> May 12% 6,000 0.09 0.19 0.28 <br /> June 8% 4,000 0.06 0.18 0.24 <br /> July 10% 5,000 0.07 0.19 0.26 <br /> August 14% 7,000 0.10 0.19 0.29 <br /> September 6% 3,000 0.04 0.18 0.23 <br /> October 7% 3,500 0.05 0.19 0.24 <br /> Total 100% 50,000 0.74 1.50 2.24 <br /> Total Annual Production= 50,000 tons <br /> Moisture Content of Product= 2% by weight <br /> Water Used for Dust Control= 2,000 gallons per day during March through October RECEIVED <br /> Notes: <br /> (A)Estimated monthly production percentages. Provided by Bucklen Equipment Company SEP 0 e5 2018 <br /> (B)Monthly Production=(Total Annual Production)•(A) <br /> (C)Water Retained In Product=((Moisture Content of Product)•(B)*2000]/(62.4.43560) WATER STATE ENGINEENGINECRS <br /> ER <br /> (D)Water Used for Dust Control is estimated to be 2000 gallons per day during March through October COLO <br /> (E)Operation CU=(C)+(D) <br /> N:\08127 Bucklen Pit Augmentation\Disciplines(Technical)\Water Rights\SWSP\WY 2019\Bucklen Pit 2019.xlsx <br />