My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-06_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-11-06_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 6:50:25 AM
Creation date
11/7/2018 6:41:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
11/6/2018
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company
Type & Sequence
TR125
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Interoffice Memorandum <br /> <br />November 6, 2018 <br /> <br />From: Leigh Simmons <br />To: Zach Trujillo <br /> <br />Subject: Colowyo Mine (Permit No. C-1981-019) <br /> TR-125 <br /> <br />You requested that I review the material submitted by Tri-State Generation and Transmission <br />Association Inc. (Tri-State) on behalf of Colowyo Coal Company (CCC) with the TR-125 <br />application. <br /> <br />TR-125 seeks to address the requirements of Stipulation 7, and in the cover letter submitted with the <br />application Tri-State specifically requests that Stipulation 7 be removed from the permit. <br /> <br />Stipulation 7 was added to the permit on May 4, 2007, and reads: <br />THE COLOWYO COAL COMPANY SHALL SUBMIT A TECHNICAL REVISION TO THE DIVISION WHICH <br />PROVIDES AN ANALYSIS OF GROUNDWATER POINTS OF COMPLIANCE AT THE COLOWYO MINE <br />PURSUANT TO RULE 4.05.13(1). THIS ANALYSIS WILL BE DONE IN CONSULTATION WITH THE DIVISION <br />AND WILL INCLUDE A WRITTEN DETERMINATION OF THE NEED FOR GROUNDWATER POINTS OF <br />COMPLIANCE AT THE MINE. IF DEEMED APPROPRIATE, BASED ON THIS ANALYSIS, COLOWYO SHALL <br />ESTABLISH ONE OR MORE POINTS OF COMPLIANCE FOR THE COLOWYO MINE. <br /> <br />The materials submitted with TR-125 include several revised pages of text and two revised maps, as well <br />as a new exhibit: Exhibit 7 Item 15, which comprises a 2018 report by AECOM and a 2015 report by <br />Petersen Hydrologic. <br /> <br />My review is based on the content of proposed Exhibit 7 Item 15, which is, in turn, based on a single <br />rule: 4.05.13(1)(b). With this in mind, my memo is organized by topic rather than by rule citation. <br /> <br /> <br />Groundwater classification and standards <br /> <br />The conclusions of the AECOM report appear to be predicated on a misinterpretation of Regulation 41 - <br />THE BASIC STANDARDS FOR GROUND WATER [1]. Reg 41, which was promulgated under the Colorado <br />Water Quality Control Act, has been notoriously difficult to interpret. Following amendments to the Act <br />in 1989, with Senate Bill 181, a Memorandum of Agreement (MOA) was entered into between the <br />various concerned state agencies to clarify the responsibilities and authority of each [3]. <br />The MOA states that: <br />The WQCC [Water Quality Control Commission] is to remain solely responsible for the adoption <br />of water quality standards and classifications for state waters. Each implementing agency is to
The URL can be used to link to this page
Your browser does not support the video tag.