My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-01_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2018-11-01_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2018 11:57:04 AM
Creation date
11/5/2018 9:04:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
11/1/2018
Doc Name
Cost Estimate
From
Tabetha Lynch
To
Robin Reilley
Type & Sequence
RN7
Email Name
TNL
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd <br />Task # TTT Page 57 of 144 <br />Weight description: Decomposed rock - 25% <br />Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />0.900 <br />(CAT HB)) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.4863 <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />JOB TIME AND COST <br />1,026.34 LCY/hr <br />1026.34 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.255/LCY <br />Total job time: 8.77 Hours <br />Total job cost: $2,297 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.