Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 56 of 144 <br />Task description: <br />Site: Williams Fork Mines <br />PROJECT IDENTIFICATION <br />BULLDOZER WORK <br />Pond 5A -P1 <br />Permit Action: RN7 <br />Task #: 033 State: Colorado <br />Date: 10/30/2018 County: Moffat <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Permit/Job#: C1981044 <br />Abbreviation: None <br />Filename: 033 <br />$110.70 <br />Utilization % <br />NA <br />$95.46 <br />100 <br />$14.21 <br />NA <br />$0.00 <br />0 <br />$41.52 <br />NA <br />$261.89 <br />$261.89 <br />MATERIAL QUANTITIES <br />Initial Volume: 8,000 <br />Swell factor: 1.125 <br />Loose volume: 9,000 LCY <br />Source of estimated volume: Operator Estimate; Exhibit 23, Task II, Page 4 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />50 feet <br />2,110.5 LCY/hr <br />Compacted fill or embankment 0.9 <br />0% <br />5,400 feet <br />50 lbs/LCY <br />CIRCES Cost Estimating Software <br />