Laserfiche WebLink
0 <br /> RPM,Inc. <br /> outline of major soils units n <br /> •• Umt Yt Unit Yt <br /> Unit Yt ', <br /> 11 92 A x' / \ 13`96 t alrsoil mtrrraalable Lnit TkC <br /> Phase i 7.7 n <br /> t i Unit T C 11-1 A , <br /> Unit Yt 52A ...r_ <br /> ,t ; Phase 3 <br /> \Phase 2 <br /> Unit PsB 1 Unn PsB <br /> Unit mc `Unit 5A/ <br /> 3-7 A\ ' <br /> Yt <br /> 1 Unit PsB , 1.5 A s <br /> t <br /> w.' '4998103 4 <br /> r Or, <br /> las <br /> ,; <br /> A <br /> Google EarthN <br /> s• .* 100Q ft <br /> Soils Unit Mining Phase <br /> Phase 1 Phase 2 Phase 3 <br /> PsB, No PsB 3.7 A, 1.5 A, <br /> Strip 18" 8,954 cyds 3,630 cyds <br /> TkC, 5.24 A, No TkC 11.71 A, <br /> Strip 18" 12,681 cyds 28,314 Cyds <br /> Yt, 6.26 A**, 11.92 A, No Yt <br /> Strip 6" 5,051 cyds 6,617 cyds <br /> Total 17,732 cyds 15,571 cyds 31,944 cyds <br /> Potential <br /> Potential 65,247 cyds <br /> Grand <br /> Total <br /> *Estimated replacement depth based on 65,247 cyds, over approximately 48 Acres is between <br /> 4 <br />