My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-31_REVISION - M2015028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2015028
>
2018-10-31_REVISION - M2015028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:18 PM
Creation date
10/31/2018 11:44:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015028
IBM Index Class Name
Revision
Doc Date
10/31/2018
Doc Name
Request for Technical Revision
From
Teton Drilling, Inc.
To
DRMS
Type & Sequence
TR2
Email Name
PSH
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.3.3 Exhibit C — Mining Plan <br /> Mine Overview <br /> The proposed mining plan is a 110(1) Limited Impact Operation of<5 acres. This is a small <br /> operation removing limited amounts of a thin vein that varies from 6 inches to 3 feet in width <br /> using an excavator. Total length of trench is <350 feet in length with majority of trench less than <br /> 6 to 10 feet in width. <br /> The amount of material removed is estimated between 500 to 2,500 cubic yards per year. Total <br /> operation is estimated at less than 5,000 to 6,000 cubic yards over the life of the limited impact <br /> operation. It would be worth noting that a large mining operation removes this amount of <br /> material in just a few days. This proposed mining operation plans to carefully remove this <br /> amount of material over several years. <br /> A few notes on this mine: <br /> • No chemicals <br /> osives s ; «, �� •` ' � B ‘hall be done bAfirnsedilliffill <br /> • All material removed by an excavator and hand sorted <br /> • Top Soil and Waste Rock separated and stored in different locations <br /> • Surface boulders may be produced and sold from as b <br /> during overbu, en removal <br /> (a) Specify estimated dates that mining will commence and end <br /> Proposed date for mining commencement is March 31, 2016 with end date on or before July <br /> 1, 2025. <br /> (b) Estimated depth of soil <br /> All topsoil above bedrock which is estimated 2-4 inches will be stockpiled and preserved. <br /> Topsoil is to be stockpiled as shown in Exhibit E Map Number 2. The topsoil is placed in a <br /> rectangular structure built on-site with logs from trees cut down during process of mining <br /> activity measuring roughly 8' x 8' x 4' height. Top soil will be covered by tarp(s) during non- <br /> activity at mine _ . Top soil is to be used for berms, roads and to <br /> cover backfill from trenching. Note: Top soil stored will be used for covering trench backfill. <br /> As part of the mining plan the topsoil removed will be replaced from original position within <br /> 180 days of removal with the exception during winter months. <br /> Gravelly sandy loam material which is estimated from 4 to 24 inches in depth will be <br /> stockpiled and preserved in a 16' x 16' x 4' height structure built on-site with logs from trees <br /> cut down during process of mining activity Fr imme ttely used for construction of berm <br /> sion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.