My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-31_REVISION - M2015028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2015028
>
2018-10-31_REVISION - M2015028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:18 PM
Creation date
10/31/2018 11:44:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015028
IBM Index Class Name
Revision
Doc Date
10/31/2018
Doc Name
Request for Technical Revision
From
Teton Drilling, Inc.
To
DRMS
Type & Sequence
TR2
Email Name
PSH
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) Specify measures that will be taken to revegetate site <br /> • Best practices used to store and reuse all collected top soils. If additional top soil is <br /> required during reclamation then a grizzly screen would be utilized to remove rocks from <br /> stony sandy loam. The screened sandy loam would be used for any additional / required <br /> top soil. <br /> • Seeding Mix as provided by the U.S.D.A. is shown below. <br /> Foothills/Mountain Seeding Mix above 7,000ft. j <br /> Drilled 31.02 #PLS <br /> Broadcasted 61.65 #PLS <br /> Species Varlet) IN %of Mix Drill PLS/AC Broad PLS/AC <br /> Indian Ricearass PaIoma PNCB 10 0.6 1.2 <br /> Big Bluestem Kaw PN WS 10 1.1 ? 2 <br /> Little BluesteinPastura PNCB s 10 0.4 0.8 <br /> Blue Grama Hachita PNWB 10 0.3 0.6 <br /> Western Wheat.Jrass Rosana PNC'S 10 1.6 32 <br /> Noddinu Brome Native PNCS 10 0.5 1 <br /> Mountain Brome Bromar PNCB 10 I 2 <br /> Mountain Muhly Native PNCB 10 0.I 02 <br /> Arizona Fescue Redondo PNCB 10 0.3 0.5 <br /> Green Needleaass Lodorm PNCB 10 I <br /> .11 _..____... . 6.9 13.7 <br /> • During the reclamation process initial step is topsoil immediately followed by <br /> hydromulching. <br /> • Due to hydromulching there will be no need for mulching or crimping. <br /> • Due to small size of site hand tools including hoe, rake and pick utilized to break up <br /> compacted top soil areas. <br /> • Engineered roads will remain and not be part of the reclamation plan. <br /> • Some areas may require Jute Net utilized as best practice. Jute Net is estimated at .25 <br /> Acres. <br /> • Road and berms to remain intact and will not be part of the reclamation plan. This will act <br /> as a fire break plus allow future access to Clear Creek Fire Department if ever required. <br /> There are several residences about Y2 to 1 mile due East of property and there are no <br /> known firebreaks in the immediate area. <br /> • Berms or Guardrails required under MSHA: 30 CFR 56.9300 and 57.9300 30 CFR <br /> 77.1605(k). (Attached) <br /> Teton Drilling Inc. <br /> Dixie Mine-Clear Creek County,CO <br /> Updated Revisions—March 12,2016 <br /> Page 1 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.