(m) Specify whether the ore will be processed on site and nature of milling. <br /> • Hand sorted ore will run through the following process on-site as shown in further detail <br /> in Exhibit E Map 3: <br /> 1. Ore is initially hand sorted. <br /> 2. Material is crushed down to 3/8"minus in a jaw crusher. <br /> 3. Jaw crusher material is loaded into a ball mill with 20 mesh screen. <br /> 4. Material is then loaded into a Knudson Bowl for concentrating heavier minerals that <br /> is removed for further refining. <br /> 5. Recirculating water supply is stored in metal water troughs. <br /> 6. This is a water concentration process only. No chemicals or leaches will be used. <br /> 7. System (except for metal water troughs) is trailer mounted capable of running 1 to 2 <br /> tons of material per hour. Due to mucking of water and related cleanups required its <br /> estimated system is limited to running 4 to 6 tons per day. <br /> 8. Downhill portion of mill area lined with hay bales. <br /> 9. Material will be dewatered prior to backfilling. <br /> 10. Tank to tank siphoning to dewater. <br /> • Pursuant to rule 3.1.9 (2), woody vegetation utilized as fire wood, building materials, and <br /> mulch. Trees on proposed trenching plan will be removed and utilized as noted above to <br /> build structures for holding top soil, stony sandy loam plus firewood. <br /> Note: Teton Drilling Inc. will send ore to the Federal Mill and at present time is not <br /> setting crusher or wash plant up at the Dixie Mine due to plant not being ready. <br /> Teton Drilling Inc. will keep the Colorado Division of Reclamation of Mining and Safety <br /> updated if the crusher and wash plant is setup on-site at the Dixie Mine. <br /> 6.3.4 Exhibit D—Reclamation Plan <br /> (a) Replacing Overburden and replacement depth. <br /> • It's estimated that no more than 30' to length of trench opened at any given time before <br /> replacement of all materials including top soil and replanting. The constraining factor is <br /> holding capacity of plate steel waste rock holding container. <br /> • Maximum time from removal of material until replacement will not exceed 180 days <br /> except during winter months. <br /> Teton Drilling Inc. <br /> Dixie Mine-Clear Creek County,CO <br /> Updated Revisions—March 12,2016 <br /> Page I11 <br />