(c) Water diversions and impoundments will be done in a way to prevent erosion <br /> and sedimentation going into the Highline Canal and Thompson Arroyo. Care <br /> will be taken while mining to divert the storm water to the earthen berms that will <br /> be constructed to control the speed of the run off and yet maintain a flow as <br /> required. <br /> (d) The size of area that will be worked at any one time, follows: <br /> Phase 1A) 46.7 Acres <br /> Phase 1 B) 37.1 Acres <br /> Phase 2) 95.6 Acres <br /> Phase 3) 93.1 Acres <br /> Phase 4) 66.5 Acres <br /> PLEASE SEE EXHIBIT "C" MINING MAP. <br /> (e) All times in the timetable are dependent upon market conditions. The mining <br /> timetable is as follows. <br /> PHASE 1A: 46.7 ACRES <br /> START MINING January OF 2019, AND TAKE FOUR (4) YEARS TO MINE, <br /> 2019-2023. <br /> PHASE 1B: 37.1 ACRES <br /> MINING IS TO START AFTER PHASE lA & PLANS TO TAKE FIVE (5) <br /> YEARS TO MINE, 2023-2028. <br /> PHASE 2: 95. 6 ACRES <br /> MINING IS TO START AFTER PHASE 1B & PLANS TO TAKE TWELVE (12) <br /> YEARS TO MINE, 2028-2040. <br /> PHASE 3: 93.1 ACRES <br /> MINING IS TO START AFTER PHASE 2 & PLANS TO TAKE TWELVE (12) <br /> YEARS TO MINE, 2040-2052. <br /> PHASE 4: 66.5 ACRES <br /> MINING IS TO START AFTER PHASE 4 & PLANS TO TAKE TEN (10) <br /> YEARS TO MINE, 2052-2062. <br /> ALL DATES ARE DEPENDENT ON MARKET DEMAND. <br /> RECLAMATION WILL BE DONE CONCURRENTLY WITH MINING. <br />