My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-30_PERMIT FILE - M2018058
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018058
>
2018-10-30_PERMIT FILE - M2018058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 7:10:30 AM
Creation date
10/30/2018 4:31:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018058
IBM Index Class Name
PERMIT FILE
Doc Date
10/30/2018
Doc Name
Application
From
APC Southern Construction Co.
To
DRMS
Email Name
MAC
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "D" <br /> Mining Plan <br /> 6.4.4 The Mining Plan for the FRANCISCOTTI PIT #2 is as follows (Please also see <br /> map): <br /> This will be typical open pit gravel mine located on an upland terrace gravel deposit. An <br /> asphalt hot mix plant and or a concrete batch plant will be set up for projects in the area <br /> from time to time, this use is permitted by the Huerfano County Conditional Use Permit <br /> CUP Number 18-015. <br /> (a) This operation of this mine will be carried out in phases. Each phase will <br /> repeat the steps below. <br /> The initial preparation of the surface before extraction of the sand and gravel will <br /> consist of stripping the vegetation and topsoil and placing it in stockpiles for use <br /> later during reclamation. Front-end loaders, scrapers, and Excavators or any <br /> other suitable surface equipment will be used. <br /> Following the stripping of vegetation and topsoil and saving in stockpiles, earthen <br /> berms will be constructed where needed to keep the stormwater from running <br /> into the river drainage this will be part of the stormwater management plan. A <br /> more detailed view of the mining area can be seen on Exhibit "C" the Mining <br /> map. <br /> Extraction of the resource (Pit Run) will be accomplished with front-end loaders, <br /> dozers, scrapers, backhoe excavators, or any surface mining type of equipment <br /> that is economically feasible for this site. <br /> This is an open pit surface mine, and mining and construction equipment <br /> designed for this task will be used for earthmoving and transporting on site. <br /> Mining Excavation will move southeast in the pit Area. The mining will be done in <br /> such a manner as to minimize any high walls and as much as possible the pit <br /> walls will be left at a 3H:1V gradient, or flatter if the terrain permits. <br /> During all phases, Best Management Practices must and will be followed. <br /> (b) All earthmoving will be done with machinery designed for the job, eg. Dozer, <br /> front-end loaders, scrapers, excavators, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.