Laserfiche WebLink
Mining Plan Map <br /> Operator Name: AuPt Industries LLC <br /> Site Name: West Side Placer <br /> Legal Description: N V2 Section 24, Township12 North, Range 94 West, 6-n,Principal Meridian in Moffat County, Colorado <br /> Mining will be worked from north to south. Pie shaped strips will be worked around a pit previously worked. <br /> Approximately,72"of gravels are to be mined.The combined stack of overburden(topsoil)and gravels is a <br /> Stockpiled strips of salvageable approximately 80 The pay gravels lie immediately below the overburden(topsoil). Strips will not to exceed 75' <br /> topsoil-top 8"-10"of surface in width and 600'in length at a time.Tailings will be placed back in worked strip. Stockpiled topsoil will be spread <br /> material.Stockpiles that are not on-top of the worked ground. Strips will be cut on the 9.9 acre permitted area,with a maximum of 1.5 acre disturbed <br /> immediately reapplied will be during mining phases with a maximum disturbance of 2.5 acres including processing areas, ponds, roads,etc.. <br /> covered with natural erosion control Mining will proceed to the strip immediately south of the previously worked strip. <br /> Mining start and direction Only one pond will be open at a time.The north pond will be created first to cover the north section of mining.Once <br /> mining the north section will be complete,the north pond's water will be pumped over to create the south pond and <br /> 6,200' 1 <br /> the north pond will be reclaimed. <br /> Mining will commence after May 1 and end before October 31 each year. The affected lands are to be used less <br /> Reclaimed section than one hundred eighty days per year. <br /> Land and minerals owned by Colorado State Land Board. Leased to AuPt Industries LLC under Mining Lease NO. <br /> 110324. Surrounding land is owned by Colorado State Land Board.There are no other land owners or permanent <br /> Dozer/excavator to strip <br /> compacted topsoil,move ore to <br /> plant, re-grade and reclamation Continuous reclamation. <br /> Washed material placed Frac tanks used for water <br /> immediately back into storage of process water. <br /> Current mined section. worked section for <br /> Areas to be stripped will be <br /> limited to less than 1.5 acre. .• <br /> Front Loader used to feed <br /> plant ore,clear tailings <br /> Next section to mine lfootprint and deliver tailings to <br /> North Pond Placement <br /> 60'x100'020' -Max depth 8' <br /> F and not lined <br /> Pond lies in existing dam feature from past workings. <br /> 220' aS� •�Q This pond will be created by pumping rapid thickener <br /> underflow which contains 50%Solids. <br /> Rapid <br /> Moffat County Road 88 Thickener ` Natural features of past workings <br /> Washplant a;`Q���DO Wheill be used and ororeciorcPul tosedr ment before <br /> recirculation.op <br /> Dropped <br /> boo ,+►� P PP <br /> sediment from the rapid thickener will <br /> Well Flocculant Mixing Tank be reclaimed. <br /> and Holding Tanks <br /> Approved permitted area in UU <br /> green c ' 12�11 ` <br /> �J • <br /> Shipping Containers used for <br /> Existing access road Fuel and other hydrocarbons supplies,flocculant containment <br /> to site location,contained in and workshop, RV for housing, <br /> secondary containment at all Portable Office. Everything will <br /> Shipping Containers used for <br /> supplies and workshop, RV <br /> or housig, <br /> e Office. th <br /> f onlacement <br /> E erythf g will�belmobile. yo°X` 60'x100 z120'd PMax depth 8' <br /> �ot`r oo� Pond not lined <br /> o Pond lies in existing dam <br /> �oJrS feature from past workings. <br /> Previously disturbed areas <br /> ;�� outline in red dots <br /> Permit boundary 9.9 <br /> 100, Additional proposed acreage in <br /> Al <br /> CT <br /> Sign re Date <br />