Laserfiche WebLink
C. Pursuant to Rule 6.3.4(2),provide construction details of all structures to be demolished as necessary to <br /> verify the cost of demolition and disposal. <br /> The foundation for the rapid thickener is constructed with 6 sonotube concrete pillars.Less than 5 cubic yards of con- <br /> crete was used in the construction of the foundation.Demolished concrete foundation will be used as backfill for the <br /> reclamation of the North Pond. <br /> AuPt Industries LLC 1970 306 1784 1 P.O.Box 1424-Edwards,CO 81632 <br />