My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-30_PERMIT FILE - C1981038 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2018-03-30_PERMIT FILE - C1981038 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2018 8:00:18 AM
Creation date
10/29/2018 7:57:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
3/30/2018
Section_Exhibit Name
Volume 7 3.05 Bond Requirements Paonia Loadout
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 1 Mine <br />Bond Release 6 (SL-06) <br />Estimated Bond Amount Applicable to Loadout <br />Task <br />Task <br />Hours <br />Cost <br />146 Mobilize/Demobilize Equipment for Initial Reclamation 50% <br />10.28 <br />$ <br />21,427.00 <br />147 Mobilize/Demobilize Equipment for Pond Cleaning 50% <br />10.28 <br />$ <br />1,334.00 <br />1481 Mobilize/Demobilize Equipment for Pond Removal 50% <br />10.28 <br />$ <br />1,941.00 <br />149 Mobilize/Demobilize Equipment for Site Maintenance 50% <br />10.28 <br />$ <br />9,090.50 <br />158 Yearly Site Maintenance (50%) <br />0.00 <br />$ <br />47,543.90 <br />201 Seal Loadout Wells <br />177.00 <br />$ <br />3,383.48 <br />202 Demolish and Remove all Structures at Train Loadout <br />175.00 <br />$ 357,314.50 <br />2041 Haul Footprint of Loadout Stockpiles to Refuse Area <br />4.37 <br />$ <br />7,979.00 <br />205 Rip Coal Storage/Loadout Area <br />0.63 <br />$ <br />758.00 <br />206 Excavation/Grading at Storage Area and Loadout <br />34.33 <br />$ <br />40,919.00 <br />207 Grade Railroad Spur <br />50.43 <br />$ <br />60,100.00 <br />208 Finish Grade Railroad Spur <br />16.26 <br />$ <br />2,124.00 <br />209 Replace Topsoil from Stockpile to Truck Dump Station <br />0.59 <br />$ <br />709.00 <br />210 Reseed Train Loadout and Coal Stockpile Areas <br />80.00 <br />$ <br />46,169.00 <br />211 Remove Coal Stockpile Pond <br />0.19 <br />$ <br />229.00 <br />212 Remove Train Loadout Pond <br />1.58 <br />$ <br />1,884.00 <br />540.38 <br />$ 602,905.38 <br />Liability insurance 2.02 <br />2.02%1 <br />$ <br />12,178.69 <br />Performance Bond: 1.05 <br />1.05% <br />$ <br />6,330.51 <br />Job superintendent 50% <br />$ <br />16,579.07 <br />Profit <br />10% <br />$ <br />60,290.54 <br />Contract Amount <br />$ 698,284.18 <br />Financial warranty 50% <br />$ <br />250.00 <br />Engineering work <br />6% <br />$ <br />41,897.05 <br />Reclamation Management <br />4.5% <br />$ <br />31,422.79 <br />Total Indirect Cost <br />$ <br />73,569.84 <br />Total Reclamation Estimate <br />$ 771,854.02 <br />RN -07 Volume 7 Section 3.05 02/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.