Laserfiche WebLink
3,05.2 <br />Bowie Resources Limited <br />Bowie No. 2 Mine <br />Reclamation Cost Summary' <br />Direct Costs <br />Category <br />Task# <br />Task Description <br />Cost <br />A. Earthwork - Backfilling and Rough Grading <br />90 <br />Grade railroad spur <br />38,704 <br />C. Earthwork - Waste/Tailings Pile Capping <br />and/or Cover Placement <br />94 <br />Haul "footprints" of loadout area stockpiles to refuse area <br />5,556 <br />E. Earthwork - Ripping <br />34 <br />Rip Coal Storage/Loadout Area <br />402 <br />G. Earthwork - Finish Grading <br />56 <br />Final Grade Railroad Spur <br />1,443 <br />H. Earthwork - Stream Channel <br />Construction/Reconstruction <br />64 <br />Irrigation Ditch Establishment <br />662 <br />65 <br />Excavation/Grading at Storage/Loadout <br />32,850 <br />I. Earthwork - Drainage Control System <br />Installation/Removal <br />75 <br />Remove Coal Stockpile Pond <br />179 <br />77 <br />Remove Train Loadout Pond <br />1,354 <br />J. Earthwork - Topsoil/Subsoil Replacement & <br />Special Handling <br />82 <br />Redistribute Topsoil at truck dump station <br />617 <br />L. Drill Hole/Monitoring Well Installation and/or <br />Sealing <br />. <br />86c <br />Sea[ Loadout Wells <br />4,271 <br />M. Revegetation and Reseeding <br />87c <br />Revegetate Remaining Mine Site <br />39,437 <br />N. Structural Demolition & Removal <br />88 <br />Structural Demolition <br />2,216,934 <br />O. Mobilization/Demobilization <br />89a <br />Reclamation <br />41,442 <br />89c <br />Yearly Maintenance <br />2,362 <br />P. Miscellaneous Reclamation Costs <br />all tasks at 50% of Division calculation <br />117,374 <br />Total Direct Costs <br />2,503,587 <br />Indirect Costs <br />Public Liability Insurance <br />38.806 <br />Contractors Performance Bond <br />21,531 <br />Contractors Profit <br />250,359 <br />Job Superingtendent <br />55,915 <br />Subtotal <br />366,610 <br />Total Construction Contract Amount <br />2,870,197 <br />*Taken from the Divisions Estimate <br />