Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 204 <br />Payload Capacity: 53.27 LCY <br />Truck Bed (volume) Bas is <br />Struck Volume: <br />35.00 <br />LCY <br />Heaped Volume: <br />46.50 <br />LCY <br />Average Volume: <br />40.75 <br />LCY <br />Adjusted Volume: <br />46.50 <br />LCY <br />Final Truck Volume Based on Number ofLoader Passes <br />Loading Tool Capacity <br />Rated Capacity: _ <br />Bucket Fill Factor: _ <br />AdjustedCapacity: <br />Job Condition Corrections: <br />43.88 <br />Bucket Size Class: NA <br />Page 2 of4 <br />LCY <br />Site Altitude (ft.): 7100 feet <br />I Job Efficiency: 1 0.830 1 0.830 1 (CAT HB) <br />Net Correction: 1 0.830 1 0.830 1 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels <br />Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Bas is Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />4 passes <br />Wheel and Track Loaders -Unadjusted Basic Loader Cycle Time (load, dump, 0.600 minutes <br />maneuver): <br />Cycle Time Factors <br />0.700 <br />Factor min. <br />Source <br />Material: <br />Material 3/4" to 6" diameter 0.00 <br />0.000 <br />Cat HB <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high orless <br />0.01 <br />0.010 <br />(Cat HB) <br />TruckOwnership: <br />Common ownership oftrucks and loaders - <br />0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Cat HB <br />Net Uycle Tune Adjustrnent: -0.070 minutes <br />Adjusted Loader Cycle Time: 0.530 minutes <br />Net Load Time per Truck: 1.690 minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.70 Minutes <br />TruckL.oadTime: 1.690 Minutes <br />Truck Maneuver and Dump 1.10 Minutes <br />Time: <br />Adjustedforsitealtitude: <br />0.700 <br />Minutes <br />Adjustedforsitealtitude: <br />1.690 <br />Minutes <br />Adjustedforsitealtitude: <br />1.100 <br />Minutes <br />CIRCES Cost Estimating SoSware <br />