Laserfiche WebLink
Job Condition CorrectionFactor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />0.900 <br />CAT HB <br />Dozing method: <br />1.200 <br />(S -BY -S) <br />Visibility: <br />1.000 <br />(AVG. <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />1.115 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material W eight: <br />0.902 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.5409 <br />Adjustedunit <br />production: <br />Adjustedfleet <br />production: <br />JOB TIME AND COST <br />843.80 LCY/hr <br />843.8 LCY/hr <br />Fleetsize: 1 Dozer(s) <br />Unit cost: $0.536/LCY <br />Total job time: 8.89 Hours <br />Totaljob cost: $4,016 <br />Page 83 of 115 <br />CIRCES Cost Estimating Solware <br />