Laserfiche WebLink
Page 82 of 115 <br />BULLDOZER WORK <br />Taskdescription: Regrade Topsoil for Temporary North Access Road <br />Site: Colowyo Coal Mne Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 040 State: Colorado Abbreviation: None <br />Date: 5/16/2018 County: Moffat Filename: C019-040 <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />CatD11T - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/flour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour- <br />Ripper <br />ost/HourRipper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $451.88 <br />TotalFleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 7,499 <br />Swell factor: 1.000 <br />Loose volume: 7,499 LCY <br />Source ofes timated volume: Exhibit 7-23B, Table 1, Exh. 7 -item 23, Fig. B-1 <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 200 feet <br />Unadjustedhourly 1,560.0 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Averagepush -5% <br />gradient: <br />Averages ite altitude: 7,500 feet <br />Material weight: 2,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />CIRCES Cost Estimating Software <br />Utilization % <br />$226.13 <br />NA <br />$183.90 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $451.88 <br />TotalFleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 7,499 <br />Swell factor: 1.000 <br />Loose volume: 7,499 LCY <br />Source ofes timated volume: Exhibit 7-23B, Table 1, Exh. 7 -item 23, Fig. B-1 <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 200 feet <br />Unadjustedhourly 1,560.0 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Averagepush -5% <br />gradient: <br />Averages ite altitude: 7,500 feet <br />Material weight: 2,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />CIRCES Cost Estimating Software <br />