Laserfiche WebLink
electrical cable, etc. Both areas are depicted on Drawing D-3-5. <br />(34) Utility Corridors <br />Power and communication lines under the auspices of the Public Service <br />Company of Colorado make up the utility corridors at the mine. The <br />utility corridors are indicated on facilities map D-2-2, base maps <br />D-3-4 and D-3-5, and at a broader scale on land use maps D-3-2 and <br />D-3-3. <br />The following lists the facilities which have specific design criteria <br />and their completion dates. <br />3 Mine Bathhouse <br />Coal Wash Plant <br />Coal Silos <br />Breaker House <br />Salary Bathhouse <br />April, 1976 <br />April, 1976 <br />August, 1976 <br />September, 1975 <br />June, 1982 <br />4.3.1.4 Ponds, Impoundments, and Diversions <br />Ponds, impoundments and diversion systems on the mine site are <br />discussed briefly in the following paragraphs. Detailed descriptions <br />and design details are given in Section 4.6.1.3, "Protection of the <br />Hydrologic Balance". <br />4-16 <br />a <br />