My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-17_PERMIT FILE - C1981025A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981025
>
2018-09-17_PERMIT FILE - C1981025A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 10:26:47 AM
Creation date
10/24/2018 10:07:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025A
IBM Index Class Name
Permit File
Doc Date
9/17/2018
Section_Exhibit Name
4.0 Operation and Reclamation Status
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />The disturbed area resulting from the disposal activity is estimated as follows: <br />1. Disposal site 35 -feet by 45 -feet. (0.04 Acres) <br />2. Temporary storage of soil and topsoil, 20 -feet by 45 -feet. (0.02 Acres) <br />3. Approximately 300 -feet of 10 -foot wide temporary roadway. (0.07 Acres) <br />This 0.13 acre disturbance should not have an adverse effect on the sediment loading in <br />the long pond. Soil loss or erosion is measured in tons per acre per year. Page 4-19iii <br />indicates the reclaimed area will loose 0.31 tons per acre per year. The crop management <br />factor included in this number must be set at one (1) for a bare area. Therefore, a newly <br />disturbed area will lose 11.2 tons per acre until vegetation is established. Application of <br />this soil loss factorto the disturbed area resulting from the disposal activity results in a loss <br />of 1.46 (0.13 X 11.2) tons per year which equates to about one cubic yard of dirt per year. <br />This one cubic yard of dirt will settle out in the long pond and theoretically occupy an area <br />20 -feet square by 0.9 inches deep. <br />The disposal site is located above the long pond so all surface run-off from the site will be <br />collected in the long pond. The disposal site is about 10 -feet above the elevation of the <br />long pond and is therefore well above the water table. Any seepage (leachate) from the <br />disposal site would likely be intercepted by the long pond. <br />4-66k <br />11/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.