Laserfiche WebLink
October 16, 2018 C-1982-056/Foidel Creek Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 8 <br /> <br />the area of the stock pond during the October inspection. <br /> <br />Location Water Dscg source goes to notes <br />6MN Reservoir Y N mine water Recycling <br />water <br /> <br />6MN ventilation <br />shaft site sed pond <br />Y N pad runoff Gopher holes were filled in <br />Fish Creek Tipple <br />pond <br />Y Y <br /> <br />Fish Creek Borehole Y N mine water (flock <br />added) <br />Fish creek 3 cell pond , discharge at site 115 <br />triggers sampling at Fish creek <br />downstream. <br />Iron staining on rocks in outfall <br />18LT vent shaft <br />ponds <br />N N <br />Pond F N N runoff from <br />facilities <br />Foidel <br />Pond G N N Surface Runoff <br />from laydown <br />Area <br />Foidel <br /> <br />Pond E Y N Delta forming @inlet (operator <br />stated they are working on getting a <br />long reach shovel to clear) <br />Area No. 1 Pond <br />(Pit Pond) <br />Y N mine, sumps, <br />diversion ditch <br /> <br /> Water goes to wash plant or <br />recycled underground <br />Waste pile under <br />drain <br /> Y Pond D <br />Pond D Y Y <br />Pond B Y N Bob pile Foidel Erosional feature above inlet needs <br />to be stabilized, cattail cleared from <br />weir <br />Pond C N N <br /> <br />Pond T N N laydown area Foidel v-notch weir, culvert under railway