My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-23_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2018-10-23_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 8:57:02 AM
Creation date
10/23/2018 12:52:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
10/23/2018
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
10/17/2018
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 17, 2018 C-1996-083/Bowie No. 2 Mine JHB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 4 of 6 <br /> <br />REVEGETATION – Rule 4.15 <br />Vegetative Cover; Timing: <br /> The recent precipitation and cooler temperatures make this time good for treatment of noxious Winter <br />annual grasses. The operator is planning to use glysophate (round-up). This should be effective as long as the <br />perennial species in the area are dormant. The operator will verify the label for proper application. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br /> Due to the reduced staff, the operator has decided to shut down the upper warehouse and office at the <br />upper portal area. Staff was moving records and supplies down to the coal sales office. This will be the new <br />location of the office. Power and telecommunications will be shut down to the upper office by the end of the <br />week, and reestablished at the coal sales building by Monday 10/22. <br /> <br />Portal benches are well maintained, and mostly tidy. Excess metal is being removed for scrap. Two ventilation <br />tubes have rolled down slope south of B-portal bench. These will need to be retrieved before long and disposed of <br />or stored properly. <br /> <br /> <br />DOCUMENTS RECEIVED NA <br />OTHER (SPECIFY) NA <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />
The URL can be used to link to this page
Your browser does not support the video tag.