Laserfiche WebLink
PART <br /> Page 39 of 67 <br /> Permit No.:COG500000 <br /> 6. Additional Control Measure Requirements <br /> The permittee shall document the schedules, procedures,and evaluation results for the following subset of practice-based <br /> effluent limitations. <br /> a. Good Housekeeping(see Part I.C.2.a.ii)-A schedule for regular pickup and disposal of waste materials,along with <br /> routine inspections for leaks and conditions of drums,tanks and containers. <br /> b. Maintenance(see Part I.C.2.a.iii)-Preventative maintenance schedules for industrial equipment and systems;control <br /> measures;and any back-up practices in place should a runoff event occur while a control measure is off-line. <br /> c. Spill Prevention and Response Procedures(see Part I.C.2.a.iv)-Procedures for preventing,responding to,and reporting <br /> spills and leaks.The permittee may reference other plans(e.g.,a Spill Prevention Control and Countermeasure(SPCC) <br /> plan)otherwise required by a permit for the facility, provided that a copy of the other plan is kept onsite with the <br /> SWMP,and made available for review consistent with Part 11(SWMP—General SWMP Requirements). <br /> d. Employee Training(see Part I.C.2.a.viii)-A schedule for all types of training required by this permit, content of the <br /> training,and log of the dates on which specific employees received training. <br /> e. Non-Stormwater Discharges(see Part I.C.2.a.ix)-Documentation of the stormwater conveyance system evaluation for <br /> the presence of non-stormwater discharges not authorized in Part.I.A.1.c,and the elimination of all unauthorized <br /> discharges. Documentation of the evaluation must include: <br /> i. The date of any evaluation; <br /> ii. A description of the evaluation criteria used; <br /> iii. A list of the outfalls or onsite drainage points that were directly observed during the evaluation; <br /> iv. The different types of non-stormwater discharge(s)and source locations;and <br /> v. The action(s)taken,such as a list of control measures used to eliminate unauthorized discharge(s),if any were <br /> identified. <br /> 7. Inspection Procedures and Documentation <br /> The permittee shall document inspection procedures,and maintain such procedures and other documentation with the SWMP, <br /> as follows: <br /> a. The permittee shall document procedures for performing the facility inspections required by Part I.J(Facility <br /> Inspections)of the permit. Procedures must identify: <br /> i. Person(s)or positions of person(s)responsible for inspection; <br /> ii. Schedules for conducting inspections,including tentative schedule for facilities in climates with irregular <br /> stormwater runoff discharges;and <br /> iii. Specific items to be covered by the inspection,including inspection schedules for specific outfalls. <br /> b. The permittee shall maintain inspection documentation with the SWMP as required by Part I.J (Facility Inspections)of <br /> this permit. <br /> c. Permittees that invoke the exception to quarterly inspections for inactive and unstaffed facilities must include in the <br /> SWMP the signed and certified documentation to support this claim as required in Part I.J(Facility Inspections). <br /> 8. Monitoring Procedures and Documentation <br /> The permittee shall document monitoring procedures,and maintain such procedures and other documentation with the SWMP, <br /> as follows: <br /> a. The permittee shall document procedures for performing any applicable types of monitoring required by Part 1.1 <br /> (Specific Monitoring Requirements)of the permit,including: <br /> i. Visual assessment monitoring(see Part 1.1.1) <br />