My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-22_REVISION - M2008078 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2018-10-22_REVISION - M2008078 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 6:27:12 AM
Creation date
10/23/2018 10:02:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
Revision
Doc Date
10/22/2018
Doc Name Note
Part 2 of 6
Doc Name
Request For Amendment To Permit
From
Prowers Aggregate Operators, LLC
To
DRMS
Type & Sequence
AM1
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART <br /> Page 38 of 67 <br /> Permit No.: COG500000 <br /> iv. On-site dust or particulate generating processes,including dust collection devices and vents. <br /> v. On-site waste treatment,storage,or disposal,including waste ponds and solid waste management units. <br /> vi. Vehicle and equipment fueling, maintenance,and/or cleaning(includes washing). <br /> vii. Immediate access roads and rail lines used or traveled by carriers of raw materials,manufactured products,waste <br /> material,or by-products used or created by the facility. <br /> viii. Roofs or other surfaces exposed to air emissions from a manufacturing building or a process area. <br /> ix. Roofs and associated surfaces composed of galvanized materials that may be mobilized by stormwater(e.g.,roofs, <br /> ducts,heating/air conditioning equipment,gutters and downspouts). <br /> b. Inventory of materials <br /> The inventory shall list materials that contribute,or have the potential to contribute, pollutants to stormwater,including <br /> but not limited to the following: <br /> i. The types of materials handled at the facility that may be exposed to precipitation or runoff and could result in <br /> stormwater pollution. <br /> ii. The types of materials handled at the facility that may leak or spill,and be exposed to precipitation or runoff and <br /> result in stormwater pollution. <br /> iii. A narrative description of any potential sources of pollutants from past activities, materials and spills that could <br /> contribute pollutants to stormwater discharges,and the corresponding outfall(s)that would be affected by such <br /> spills and leaks.The description shall include the method and location of any on-site storage or disposal;and <br /> documentation of all significant spills and leaks of oil or toxic or hazardous pollutants that occurred at exposed <br /> areas,or that drained to a stormwater conveyance,in the 3 years prior to the SWMP preparation date. <br /> c. Assessment of potential pollutant sources <br /> The assessment of potential pollutant sources shall provide a short narrative or tabulation describing the potential of a <br /> pollutant to be present in stormwater discharges for each facility activity,equipment and material identified above.The <br /> permittee shall update this narrative when data become available to verify the presence or absence of these pollutants. <br /> Potential pollutant sources include: <br /> i. Loading and unloading operations; <br /> ii. Outdoor storage of chemicals or equipment; <br /> iii. Crushing facilities or significant dust and particulate generating activities; <br /> iv. On site waste disposal practices; <br /> v. Stockpiles of overburden,raw material, intermediate products,byproducts,finished products or waste products; <br /> vi. Asphalt or concrete batch plants or areas used for recycling of asphalt or concrete; <br /> vii. Routine maintenance activities involving fertilizers,pesticides,detergents,fuels,solvents,oils,etc.; <br /> viii. Haul roads;and <br /> ix. Disturbed and revegetated areas. <br /> 5. Description of Control Measures <br /> a. The permittee shall document the location,installation date,type,and implementation specifications of each non- <br /> structural and structural control measure implemented at the facility to achieve meet the effluent limitations <br /> contained in this permit. Documentation must include those control measures implemented for stormwater run-on <br /> that commingles with any discharges covered under this permit. <br /> b. Installation and implementation specifications for each control measure used by the permittee to meet the effluent <br /> limitations contained in this permit must be retained with the SWMP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.