Laserfiche WebLink
of Coto <br /> e� 99 <br /> " $ TR08 <br /> COLORADO DI` MATION, MINING AND SAFETY <br /> 1313 Sherman St orado 80203 ph(303)866-3567 <br /> /876 ECSIMac RIONive8 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET OCT 2 2 2018 <br /> File No.: M- 2004-078 Site Name:Lu pton Lakes Resou rcems1ON of OECLaMATION <br /> Weld MININSAND SAFETY <br /> County TR# (DRMS Use only) <br /> Permittee:City and County of Denver, Board of Water Commissioners <br /> CD 0 <br /> Operator(If Other than Permittee):Martin Marietta Materials, Inc K 3 <br /> Permittee Representative: <br /> Ryan Stitt, City and County of Denver, Board of Water Commissioners M C <br /> � a C) <br /> b <br /> Please provide a brief description of the proposed revision: ,V <br /> Install caissaon for conveyor bridge across CO Hwy 85 to connect to M-2000-016 to facilitate W Qp <br /> mining. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted R1 o I� <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, y v <br /> the Division may require the submittal of a permit amendment to make the required or desired changes CO <br /> to the permit. <br /> The request for a TR is not considered "filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> pennittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> I IOc, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 11 Od, 112d(1, 2 or 3) $1006 <br />