Laserfiche WebLink
Loader Worksheet Cont'd Task#OIA Page 2 of 2 <br /> Length Grade Res. I Rolling Total Res. Travel Time Source <br /> feet % Res. % % minutes <br /> Haul Route: 50 0.00 8.00 8.00 0.0476 Cat HB <br /> Return Route: 50 0.00 8.00 8.00 0.0476 Cat HB <br /> Total Travel Time: 0.0951 minutes <br /> Total Cycle Time: 0.5601 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 1.50 LCY(heaped) <br /> Bucket Fill Factor: 1.100 Other-rock/dirt mixtures (100-120%) 1.100 <br /> Adjusted Capacity: 1.65 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 11500 feet <br /> Source <br /> Altitude Adj: 0.89 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.74 multiplier <br /> Unadjusted Hourly Unit Production: 176.75 LCY/Hour <br /> Adjusted Hourly Unit Production: 130.57 LCY/Hour <br /> Adjusted Hourly Fleet Production: 130.57 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 0.86 Hours <br /> Unit cost: $0.707 /LCY Total job cost: $79 <br /> CIRCES Cost Estimating Software <br />