My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-17_REVISION - P2010006
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2010006
>
2018-10-17_REVISION - P2010006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 3:06:42 AM
Creation date
10/17/2018 2:46:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010006
IBM Index Class Name
REVISION
Doc Date
10/17/2018
Doc Name Note
NOI Modofication Request
From
Earl Savage
To
DRMS
Type & Sequence
MD1
Email Name
DMC
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task#OIA Page 2 of 2 <br /> Length Grade Res. I Rolling Total Res. Travel Time Source <br /> feet % Res. % % minutes <br /> Haul Route: 50 0.00 8.00 8.00 0.0476 Cat HB <br /> Return Route: 50 0.00 8.00 8.00 0.0476 Cat HB <br /> Total Travel Time: 0.0951 minutes <br /> Total Cycle Time: 0.5601 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 1.50 LCY(heaped) <br /> Bucket Fill Factor: 1.100 Other-rock/dirt mixtures (100-120%) 1.100 <br /> Adjusted Capacity: 1.65 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 11500 feet <br /> Source <br /> Altitude Adj: 0.89 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.74 multiplier <br /> Unadjusted Hourly Unit Production: 176.75 LCY/Hour <br /> Adjusted Hourly Unit Production: 130.57 LCY/Hour <br /> Adjusted Hourly Fleet Production: 130.57 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 0.86 Hours <br /> Unit cost: $0.707 /LCY Total job cost: $79 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.