Laserfiche WebLink
I I <br /> Page 1 of 2 <br /> WHEEL LOADER-LOAD AND CARRY WORK <br /> Task description: Backfill Test Pits(3-10'x 10'x 10') <br /> Savage Mining-Mamie Permit Action: <br /> Site: Jewell Placer 2018-08-17 Permit/Job#: P2010006 <br /> PROJECT IDENTIFICATION <br /> Task#: OIA State: Colorado Abbreviation: None <br /> Date: 8/17/2018 County: Chaffee Filename: P006-01a <br /> User: DMC <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 450E Horsepower: 101 <br /> Attachment 1: ROPS Cab Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $24.67 NA <br /> Operating Cost/Hour: $26.68 100 <br /> Operator Cost/Hour: $40.90 NA <br /> Total Unit Cost/Hour: $92.25 <br /> Total Fleet Cost/Hour: $92.25 <br /> MATERIAL QUANTITIES <br /> Initial volume: 112 CCY Swell factor: 1.000 <br /> Loose volume: 112 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Loader Cycle Time: Unadjusted Basic Cycle Time(load,dump, 0.475 minutes <br /> maneuver): <br /> Cycle Time Factors Factor min. Source <br /> Material: Mixed material 0.02 0.020 (Cat HB <br /> Stockpile: Conveyor or dozer piled 10 ft.high or less 0.010 (Cat HB) <br /> 0.01 <br /> Truck Ownership: No adjustment-factor not applicable 0.00 0.000 Cat HB <br /> Operation: Constant operation-0.04 -0.040 Cat HB <br /> Dump Target: Nominal target 0.00 0.000 Cat HB <br /> Net Cycle Time Adjustment: -0.010 minutes <br /> Adjusted Basic Cycle Time: 0.465 minutes <br /> Rolling Resistance—Road Conditions <br /> Haul: Soft,rutted dirt,no maintenance or water,4"tire penetration 8.0 <br /> Return: Soft,rutted dirt,no maintenance or water,4"tire penetration 8.0 <br /> Haul and Return Time <br /> CIRCES Cost Estimating Software <br />