Laserfiche WebLink
C. Peoject Description. Describe all aspects of the operation including mining, milling, and exploration methods, materials, <br /> equipment, workforce, construction and operation schedule, power requirements, how clearing will be accomplished, topsoil <br /> stockpile, waste rock placement, tailings disposal,proposed number of drillholes and depth,depth of proposed suction dredging, <br /> and how gravels will be replaced, etc. Calculate production rates of ore. Include justification and calculations for settling pond <br /> capacities, and the size of runoff diversion channels. <br /> The proposed surface excavation will consist of 3 test holes approximately 10x10x10 accessed by an existing rock road <br /> that has been on property for many years. We will re-use the old settling ponds from the old diggings. The back hoe <br /> discribed in section Access A and D below will be used to clear land as needed. It is intended that the hours of <br /> operation will be 7 days per week 6am to 7pm with 3 main workers. All test holes will be back filled as well as the <br /> settling ponds back to a natural state with the same back hoe when the testing and mining operation is complete. Also <br /> stated that this operation has should be complete on 10/01/2024, if not an extension will be requested. We anticipate <br /> disturbing only.25 acres. This will be reclaimed as soon as testing is complete. The only no other minerals are being <br /> sought,just gold. The top soil that will be stockpiled will be 20 yards and will be stored 200 feet from the main pit and <br /> the quality will be what was obtained from the site. There will be no high walls and all open cuts will be bermed. All <br /> waste rock and backfill materials will be stockpiled in an area as shown on the map in your office and to be expected to <br /> be appoxiately 20 yards. There will be appoximately 20 yards stored on a flat serface with an apron placed around the <br /> base of the pile to prevent any erosion of the material. <br /> D. Equipment and Vehicles. Describe that which is proposed for use in your operation(Examples:drill,dozer,wash plant,mill,etc.). Include: <br /> sizes,capacity,frequency of use,etc. <br /> 2004 Ford F250 Pickup, , 1993 Hitachi 120 Back hoe, , 1991 Alpenlite 5th wheel travel trailer, homemade test <br /> plant.which is a tramal There will be one four wheel vehicles used to access the claim on a regular basis. Pictures of <br /> the equipment,other than the 2004 F250 Ford,the 1991 Alpenlite 5th wheel travel trailer and the home made tromell are <br /> attached to this submission <br /> E. Structures. Include information about fixed or portable structures or facilities planned for the operation. Show locations on the <br /> map. Include such things as living quarters,storage sheds,mill buildings, thickener tanks, fuel storage,powder magazines, <br /> pipelines, water diversions,trailers, sanitation facilities including sewage disposal, etc. Include engineering design and geotechnical <br /> information for project facilities,justification and calculations for sizing of tanks,pipelines and water diversions,etc. <br /> 1991 29'Alpenlite fifth wheel travel trailer,self contained. It is the intentions that two owners will reside in the 51h wheel <br /> while the claim is in operation. The fifth wheel will be on site for an anticipated 120 days. <br /> V. ENVIRONMENTAL PROTECTION MEASURES(SEE 36 CFR 228.8) <br /> A. Air Quality. Describe measures proposed to minimize impacts on air quality such as obtaining a burning permit for slash disposal <br /> or dust abatement on roads. <br /> We intend on obtaining a burning permitt for any burning that may have to be done. A hose will be used on any roads or <br /> dusty areas that need to have any dust contained and the water being supplied from the settling ponds by way of a water <br /> pump. <br /> (If more space is needed to fill out a block of information,use additional sheets and attach form) <br /> -3- <br />