} <br /> The ten piezometers located on the tailing impoundment main embankment were inspected and measured <br /> for depth to water. The depths to water found for each piezometer are shown in Table 2. All piezometers <br /> were either dry or contained less than twelve inches of water. <br /> Table 2-Monthly Piezometer Elevations <br /> Monitoring Well Piezometer Depth Depth to Water Depth of Water <br /> Identification Observation Date ft ft ft <br /> P6 09/27/2018 72.46 DRY N/A <br /> P7 09/27/2018 92.50 92.29 0.21 <br /> P8 09/27/2018 97.51 96.62 0.89 <br /> P9 09/27/2018 72.30 71.97 0.33 <br /> Plo 09/27/2018 58.30 57.56 0.74 <br /> I'll 09/27/2018 41.80 41.39 0.41 <br /> P12 09/27/2018 41.71 41.68 0.03 <br /> P13 09/27/2018 41.34 41.04 0.30 <br /> P14 09/27/2018 41.24 DRY N/A <br /> P15 09/27/2018 41.10 40.85 0.25 <br /> The leak detection system at the TSF Collection Pond was inspected September 27, 2018. A total of 830 <br /> gallons (29.6 GPD) were evacuated from the leak detection system and pumped to the LTF. The LTF <br /> underdrain system flow was measured to be approximately 34.0 gallons per minute(gpm). , <br /> West Pit Waste Water Treatment Plant <br /> During the month of September 2018, the West Pit Water Treatment Plant was operated under Colorado <br /> Department of Public Health and Environment(CDPHE)CDPS Permit No. C00045675 for discharge into <br /> the Rito Seco alluvial aquifer. During the month of September, 6,246,500 gallons (19.17 acre-feet) of <br /> treated water was discharged to the Rito Seco. There was 82,900 gallons (0.25 acre-feet) of water <br /> transferred from the West Pit to the LTF in September 2018. There was no sludge transferred from the <br /> water treatment plant drying pad to the LTF. <br /> BMRl performed the monthly visual seepage expression inspections on September 28, 2018 in the historic <br /> seepage area identified in Figure 2 of the permit. No seepage expressions were observed in the historic <br /> seepage area during September 2018. <br /> BMRl measured the monthly West Pit backfill, alluvial and monitoring wells as required under in the <br /> QA/QC Plan. Measurements obtained for the monthly wells are shown in Table 3. <br /> Table 3-Monthly and Quarterly Groundwater Depth to Water <br /> Monitoring Well Identification Observation Date Depth to Water <br /> B <br /> BF-4 09/27/2018 24.89 <br /> BF-511 09/27/2018 30.80 <br /> BF-6 09/27/2018 30.90 <br /> M-6 09/27/2018 DRY <br /> M-7 09/27/2018 DRY <br /> M-8 09/27/2018 DRY <br /> M-9 09/27/2018 141.58 <br /> M-10 09/27/2018 26.20 <br /> M-11R 09/27/2018 38.71 <br /> M-12 09/27/2018 175.04 <br /> M-13R 09/27/2018 125.96 <br />