Laserfiche WebLink
water table or impact ground water. (Please see Exhibit G, Section 6.4. 7 (])for a full <br /> discussion.) <br /> (c) Compliance with applicable federal and Colorado dredge and fill <br /> requirements: <br /> There are no known wetlands or other areas which require compliance with applicable <br /> federal and Colorado dredge and fill requirements. However, SEMA will comply with <br /> all applicable Federal and State dredge and fill regulatory requirements where <br /> necessary. <br /> (d) Removing temporary or large siltation structures form drainageways after <br /> disturbed areas are revegetated and stabilized, if required by the Reclamation <br /> Plan: <br /> No temporary or large siltation structures are anticipated within associated <br /> drainageways. <br /> (2) Earth dams, if necessary to impound water, may be constructed if the <br /> formation of such impoundments will not damage adjoining property or <br /> conflict with water pollution laws, rules or regulations of the federal <br /> government, the state of Colorado or with any local government pollution <br /> ordinances: <br /> No such structures are proposed for the borrow pit operation. <br /> (3) All surface areas of the affected land, including spoil piles, shall be stabilized <br /> and protected so as to effectively control erosion: <br /> All surface areas of the affected land will be stabilized and protected so as to effectively <br /> control erosion through implementation of our Corporate Stormwater Management Plan. <br /> There will be no spoil piles associated with this operation. (Please see Section 3.1.5 (10) <br /> above) <br /> 3.1.7 Groundwater—Specific Requirements <br /> (1) Standards and conditions applicable to classified and unclassified groundwater. <br /> N/A <br /> (2) Establishing permit conditions, including numeric protection levels, protective of <br /> unclassified groundwater uses. <br /> N/A <br /> (5) Any Operator, on a voluntary basis, may submit information concerning the <br /> protection of the quality of groundwater affected by the operation to the Office. <br /> The Operator may submit such information and a plan for monitoring, where <br /> appropriate, including monitoring at points of compliance, for the Office's <br /> 38 <br />