Laserfiche WebLink
Table L-1 Expansion Reclamation Task and Cost Estimate <br /> Activity Description Time(Months) Cost($) <br /> Mobilization<45 mile 1 6,000.00 <br /> Sediment settling pond topsoiling .5 12,100.50 <br /> Active mining area backfilling 2 16,133.00 <br /> Topsoil surfacing 1 16,134.00 <br /> Revegetation of disturbed areas. Includes seeding. 1 36,900.00 <br /> Subtotal 5.5 $87,267.50 <br /> DRMS Costs(28%x direct costs) $24,434.90 <br /> Final Reclamation Bond Amount $111,702.40 <br /> The final reclamation bond amount should be set at$111,702.40. <br /> Garrett Pit Greg 1. wki and Aswciatc%P1.1.4 <br /> September 2018 L-2 <br />