Laserfiche WebLink
Daily Report ■ <br /> ' VLF2 Geomembrane Recertification <br /> 475.0106.026 ■ <br /> April 19,2018 <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> ' An area of DCF slid down the slope for approximately ten feet near the 9700' bench. A meeting <br /> was held at the site discussing the situation with Laurin Colby (CC&V), Kevin Dumbrowski (Ames) <br /> and Ben Melly (NewFields). The decision was made to buttress the area near the 9650' bench. A <br /> ' NewFields representative will observe the buttress construction.This changes the schedule as no <br /> work activities were scheduled for tomorrow, April 20, 2018. <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> If you have any questions or require additional information, please contact us at your <br /> ' convenience. <br /> Sincerely, <br /> ' NewFields Mining Design &Technical Services <br /> Prepared by: <br /> Benjamin Melly. 817.889.7315 <br /> 1 f fY ,f � <br /> Ore Removal <br />