Laserfiche WebLink
■NewFields <br /> ' Perspective. Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> ' Client: Cripple Creek&Victor Gold Mining Company <br /> Project:VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date: April 19, 2018 <br /> S M T W T F S <br /> ' Temperature: Low: 29°F to High: 51°F Weather: Clear <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> ' 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT D6T LGP dozer was used to remove ore material between the 9650' and 9670' benches, <br /> ' stockpiling it near the 9650' bench. The D6T worked on a minimum of 2'of geomembrane cover. <br /> The mini excavator was used to excavate test pit locating the geomembrane along the 9645' <br /> elevation. One test pit was excavated and the geomembrane was exposed. <br /> 1.2 Geomembrane Repair <br /> Damaged geomembrane was removed between 9650' and 9670' elevation. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> ' NewFields personnel observed ore removal, geomembrane exposure, and the excavation of test <br /> pits during the shift. <br />