My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-03_PERMIT FILE - C1981019A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-08-03_PERMIT FILE - C1981019A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 12:41:14 PM
Creation date
9/21/2018 9:02:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
8/3/2018
Section_Exhibit Name
EXHIBIT 15 Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />Colowyo Coal Company, L. P. <br />Permit No. 95MF1040 <br />Issuance 7 <br />GENERAL TERMS AND CONDITIONS: <br />17. This permit and any attachments must be retained and made available for inspection upon <br />request. The permit may be reissued to a new owner by the Division as provided in Regulation <br />No. 3, Part B, Section 11.6 upon a request for transfer of ownership and the submittal of a revised <br />APEN and the required fee. <br />18. If this permit specifically states that final approval has been granted, then the remainder of this <br />condition is not applicable. Otherwise, the issuance of this construction permit is considered initial <br />approval and does not provide "final" approval for this activity or operation of this source. Final <br />approval of the permit must be secured from the APCD in writing in accordance with the <br />provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation No. 3, Part B, Section III.G. Final <br />approval cannot be granted until the operation or activity commences and has been verified by <br />the APCD as conforming in all respects with the conditions of the permit. Once self -certification of <br />all points has been reviewed and approved by the Division, it will provide written documentation <br />of such final approval. Details for obtaining final approval to operate are located in the <br />Requirements to Self -Certify for Final Approval section of this permit. The operator shall retain the <br />permit final approval letter issued by the Division after completion of self -certification with the <br />most current construction permit. <br />19. This permit is issued in reliance upon the accuracy and completeness of information supplied by <br />the applicant and is conditioned upon conduct of the activity, or construction, installation and <br />operation of the source, in accordance with this information and with representations made by the <br />applicant or applicant's agents. It is valid only for the equipment and operations or activity <br />specifically identified on the permit. <br />1 t.4, Z- It 0 �, - � �'%! & -- <br />By: f By: <br />Charles N. Pray, P.E.-P.L.S R K Hancock 111, P.E. <br />Permit Engineer Construction Permits Unit Supervisor <br />AIRS ID: 081/0007 & 103/0327/001 <br />Page 8 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.