Laserfiche WebLink
Page 21 of 115 <br />SCRAPER TEAM WORK <br />Task description: Haul/RegradeTopsoil toCollomHaulRoad. 242+00-275+20 <br />Site: Colowyo Coal Mne Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 010 State: Colorado Abbreviation: None <br />Date: 5/16/2018 County: Moffat Filename: C019-010 <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COSTShift basis: 1 mer day <br />Equipment Description <br />-Scraper: I Cat 637G w/ ush- ull <br />-Dozer: NA <br />-Du Area: CatD11T - 1lU <br />Road Maintenance —Motor Grader: CAT 16M <br />-Water Truck: I WaterTanker,5,000Gal. <br />Cup. tBreakdown: ScranerWorkTeam <br />SuDDort Eauinment Maintenance Equipment <br />Totalworkteam cost/hour: $4,511.85 <br />MATERIAL QUANTITIES <br />Initial volume: 26,098 CCY Swell factor: 1.125 <br />Loosevolume: 29,360 LCY <br />Source of estimated volume: Table 7 Exh. 13B -T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />MotorGrader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />75 <br />25 <br />25 <br />Ownership cost/hour: <br />$152.84 <br />NA <br />NA <br />$226.13 <br />$72.40 <br />$24.01 <br />Operating cost/hour: <br />$158.39 <br />NA <br />NA <br />$137.93 <br />$14.49 <br />$8.53 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripperown. cost/hour: <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripperop. cost/hour: <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.26 <br />NA <br />NA <br />$41.85 <br />$28.90 <br />$0.00 <br />Unit Subtotals: <br />$342.49 <br />NA <br />NA <br />$405.90 <br />$115.79 <br />$32.54 <br />Number of Units: <br />8 <br />0 <br />0 <br />4 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$2,739.92 <br />Support: <br />$1,623.60 <br />Maint: <br />$148.33 <br />Totalworkteam cost/hour: $4,511.85 <br />MATERIAL QUANTITIES <br />Initial volume: 26,098 CCY Swell factor: 1.125 <br />Loosevolume: 29,360 LCY <br />Source of estimated volume: Table 7 Exh. 13B -T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating SOilwam <br />ScraperBowl (volume) Basis: <br />Materialweight: <br />2,550 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Earth - Drypacked <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />32.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating SOilwam <br />