My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-09_PERMIT FILE - C1981019A (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-07-09_PERMIT FILE - C1981019A (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2018 7:28:21 AM
Creation date
9/20/2018 12:43:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
7/9/2018
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Altitude Adj: 1 1.000 1 NA I (CAT HB) <br />Job Efficiency: 1 0.830 1 NA I (CAT HB) <br />Net Correction: 1 0.830 NA <br />TravelTime: <br />Road Condition: Hard, smooth, stabilized, surfaced watered maintained 2.0 <br />HaulRoute: <br />Page 20 of 115 <br />Site Altitude: 7500 feet <br />Seg # Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />1 <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />1 700.00 <br />-3.00 <br />2.00 <br />-1.00 <br />2972 <br />0.30 <br />HaulTime: 030 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />%) <br />Roll. Res <br />% <br />Total Res <br />% <br />1 <br />Velocity <br />m <br />1 <br />rave Time <br />(min) <br />1 <br />700.00 <br />3.00 <br />1 2.00 <br />5.00 <br />2795 <br />0.42 <br />Return Time: <br />0.42 <br />minutes <br />Total Scraper teamcycle time: <br />2.32 <br />minutes <br />Adjusted forjob conditions: <br />1,245.00 <br />LCY/Hour <br />Selected Numberof Scrapers: <br />2 <br />Scraper(s) <br />Adjustedsingle scraper team (unit) hourly production: <br />1,245.00 <br />LCY/Hour <br />Adjustedmultiple scraper team (fleet) hourly production: <br />4,980.00 <br />LCY/Hour <br />Unadjustedunitproduction/hour: 1,500.00 LCY/Hour <br />Optimal Numberof Scrapers perpush dozer: <br />JOB TIME AND COST <br />Fleet size: 4 Team(s) Totaljobtime: <br />2.76 Hours <br />Unitcost: $0.906 /LCY Totaljobcost: $12,459 <br />CIRCES Cost Estimatmg Solwaie <br />
The URL can be used to link to this page
Your browser does not support the video tag.